Energy Engineering - Power Production from Renewable Energy

Ex 1 - ENERGY AND ECONOMIC ASSESSMENT OF A WIND TURBINE - Results

Divided by topic

ENERGY AND ECONOMIC ASSESSMENT OF A WIND TURBINE Power Production from Renewable Energy – A.Y. 201 9/20 Prof. Paolo Silva – Ing. Elena Crespi Results cas e A EE tot yield [GWh/y] 4.11 1 Equivalent hours [h/y] 2284 Capacity factor 26.6 % NPV overnight [k€] 2212 IRR 11. 7 % LCOE [c€/kWh] 6.57 PBP Year 9 Results case B Coeff Weibull - K 1.47 Coeff Weibull - C 5.44 EE tot yield [GWh/y] 3.318 Equivalent hours [h/y] 1844 Capacity factor 21.4 % NPV overnight [k€] 1347 IRR 8.97 % LCOE [c€/kWh] 8.1 4 PBP Year 11 Results case C Results are obtained using the Weibull distribution. EE tot yield [GWh/y] 3.298 Equivalent hours [h/y] 1649 Capacity factor 18.8 % NPV overnight [k€] 1234 IRR 8.41 % LCOE [c€/kWh] 8.52 PBP Year 11