← Indietro
EsameEsame completoTesto d’esame

13 01 21

Esame completo di Operations Management per il corso di Management Engineering presso Politecnico di Milano. Materiale proveniente dall’archivio storico Studwiz e classificato per la consultazione online.

Operations ManagementEsame completo

Informazioni sul documento

Cosa trovi in questo materiale

Esame completo di Operations Management per il corso di Management Engineering presso Politecnico di Milano. Materiale proveniente dall’archivio storico Studwiz e classificato per la consultazione online.

Qualità dell’importazione: il testo è stato estratto direttamente dal documento originale.

Contenuti estratti dal documento

Passaggi rappresentativi riconosciuti nelle diverse parti del materiale. Il testo completo resta presente nella pagina per la ricerca, mentre l’anteprima compatta rende più semplice la lettura.

Pagina 1

Schnay company produces only standard products and has an EPE equal to -0,76 days. Which indication does the company take? (1 Point) 4. Schnay company needs SMED to reduce setup time Schnay company is able to produce the whole volume but not the mix Schnay company is sure to produce both volume and mix required by customers Schnay company has not enough capacity to fulfill demand volume Consider a manufacturing company producing shirts and define which activity is value adding. (1 Point) 5. Perform a quality control on the colour of the shirts before delivering them to the customers Sew the buttons on the shirts Bring the toolkit to the right place Clean the stations Choose the one correct answer (1 Point) 6. Protection level of discounted price tickets is necessary to avoid cannibalization from full price tickets Having fixed capacity of event’s seats, we should start selling full price tickets to ensure profit maximization and cover all the seats available In order to maximize my revenues, it is more convenient to sell all tickets to low cost passengers as I am sure they will buy them all Page 1/12 Protection level of full price tickets is necessary to avoid cannibalization from discounted price tickets What are the benefits of small scale capacity increments compared to big scale increments? (1 Point) 7. Financing availability Economies of scale Over utilization costs None of the answers Usually, comparing SES company with a traditional company, SES company has (1 Point) 8. higher fixed cost and higher price higher fixed cost and lower price lower fixed cost and lower price lower fixed cost and higher price Which is the longest time in an operations system? (1 Point) 9. Throughput time Value adding time Lead Time Not-value adding time Page 2/12 For the Shuldice…

Anteprima

Prima pagina del documento.

Prima pagina: 13 01 21