← Indietro
EsameEsame completoTesto d’esame

1645014776 EX1 LEAN 2022 01 14

Esame completo di Operations Management per il corso di Management Engineering presso Politecnico di Milano. Materiale proveniente dall’archivio storico Studwiz e classificato per la consultazione online.

Operations ManagementEsame completo

Informazioni sul documento

Cosa trovi in questo materiale

Esame completo di Operations Management per il corso di Management Engineering presso Politecnico di Milano. Materiale proveniente dall’archivio storico Studwiz e classificato per la consultazione online.

Qualità dell’importazione: il testo è stato estratto direttamente dal documento originale.

Contenuti estratti dal documento

Passaggi rappresentativi riconosciuti nelle diverse parti del materiale. Il testo completo resta presente nella pagina per la ricerca, mentre l’anteprima compatta rende più semplice la lettura.

Pagina 1

Exercise 2 (12 points) The Christmas Everyday Company produces high quality professional skis for winter sport teams. The range of this product family is composed by a combination of 5 different sizes and 12 different surface painting. The customer demand is based on a combination of five different sizes and 12 surface paintings leading to 60 variants. The average demand is equal to 400 units per day, the daily demand is not so stable (+/- 25%) and everyday all the variants are requested by the customers, who are not willing to wait for the products. Production process: The production system is composed by the following stages: Machining: this stage is 50% of the time dedicated to this family product. There are two operators that use a manual machine and work in parallel on different pieces. Cutting: there are 2 operators that work in parallel in two different tables. Each operator works with manual tools and he does a ll the activities necessary to cut the item: the cutting process is composed by 6 different serial steps that take more or less the same time. A setup is necessary when product size changes; Finishing: there is one operator that uses a manual machine; a setup is necessary when product size changes; Chemical painter: there is one operator that uses an automatic machine. A setup is necessary when the variant changes. Packaging: there is an operator that uses an automatic machine. A setup is necessary when the variant changes. Each shift lasts 8 hours and there are two 15-minutes breaks per shift. All stages (except of machining stage) are completely dedicated to this product family. Upstream the production system, there is a stock of raw material of 3500 pieces. There is no scrap in any process. Stations Cycle Time (sec.) (single operator) Changeover…

Anteprima

Prima pagina del documento.

Prima pagina: 1645014776 EX1 LEAN 2022 01 14