Document information
- University
- Politecnico di Milano
- Degree programme
- Management Engineering
- Subject
- Logistics Management
- Academic year
- 2013-2014
- Classification
- Exam · Full exam
- Content
- Exam paper only
- Original format
- Text
- Searchable text
Full exam for Logistics Management in the Management Engineering degree programme at Politecnico di Milano. The document covers: POLITECNICO DI MILANO – II Facoltà di Ingegneria LOGISTICS MANAGEMENT (A.Y. 2013/2014) EXAM, 8th JULY 2014 Surname and Name: ___________________________________________ ID number: Please notice: - the overall marks are the simple average of the marks obtained in the single
Full exam for Logistics Management in the Management Engineering degree programme at Politecnico di Milano. The document covers: POLITECNICO DI MILANO – II Facoltà di Ingegneria LOGISTICS MANAGEMENT (A.Y. 2013/2014) EXAM, 8th JULY 2014 Surname and Name: ___________________________________________ ID number: Please notice: - the overall marks are the simple average of the marks obtained in the single
Import quality: text was extracted directly from the original document.
Representative passages recognised in different parts of the material. The full extracted text remains available to search, while this compact preview makes the page easier to read.
POLITECNICO DI MILANO – II Facoltà di Ingegneria LOGISTICS MANAGEMENT (A.Y. 2013/2014) EXAM, 8th JULY 2014 Surname and Name: ___________________________________________ ID number: Please notice: - the overall marks are the simple average of the marks obtained in the single exercises; - for multi-section exercises you find at the beginning of each section the points you get if you answer correctly; - if necessary, introduce the missing data, justifying the choice of the value. Exercise 1 MACCHERONI S.p.A. is a pasta manufacturer that wants to build an automated warehouse to store pallet loads (800 x 1200 x h = 1500 mm). The warehouse will be made of single deep selective racks, served by one S/R machine per aisle. In every aisle a pallet location is identified by three values: R/L: right hand side rack/left hand side rack (with respect to the I/O system); PLC: pallet location column (see Figure 1); SL: storage level (see Figure 1). Consider the following design parameters: - storage capacity not lower than 12.000 pallet locations; - throughput capacity not lower than 100 pallet loads/h; - maximum rack length equal to 80 m; - maximum rack height equal to 22,5 m; - dimensions of the bay equal to Length L = 2,8 m; Depth D = 1,3 m; Height H = 1,7 m; - three pallet locations per bay (see Figure 1); - input/output at the 3rd storage level; - horizontal speed (excluding acceleration/deceleration) of the S/R machine equal to 2 m/s; - vertical speed (excluding acceleration/deceleration) of the S/R machine equal to 0,4 m/s; - fixed positioning time equal to 5 s; - fixed time for the fork cycle equal to 10 s; - acceleration + deceleration time equal to 8 s. Assuming furthermore that: - 40 % of the cycles are single command cycles; - F.E.M. 9851 is applicable, 1. (24/30) You are…
First page of the document.