Document information
- University
- Politecnico di Milano
- Degree programme
- Management Engineering
- Subject
- Operations Management
- Academic year
- 2019-2020
- Classification
- Exam · Full exam
- Content
- Exam paper only
- Original format
- Text
- Searchable text
Full exam for Operations Management in the Management Engineering degree programme at Politecnico di Milano. The document covers: FOR THE TIMELINE PLEASE USE DIRECTLY THE EXCEL CELLS electronic customers order are sent daily orders+ forecast isseud to the supplier weekly production plans sent raw mat information 40 (size) 20 (size) 40 (surf) 10 (variant) 90% 95 100 85 3 2 2 90 3 3 50% dedicated TOTAL
Full exam for Operations Management in the Management Engineering degree programme at Politecnico di Milano. The document covers: FOR THE TIMELINE PLEASE USE DIRECTLY THE EXCEL CELLS electronic customers order are sent daily orders+ forecast isseud to the supplier weekly production plans sent raw mat information 40 (size) 20 (size) 40 (surf) 10 (variant) 90% 95 100 85 3 2 2 90 3 3 50% dedicated TOTAL
Import quality: text was extracted directly from the original document.
Representative passages recognised in different parts of the material. The full extracted text remains available to search, while this compact preview makes the page easier to read.
FOR THE TIMELINE PLEASE USE DIRECTLY THE EXCEL CELLS electronic customers order are sent daily orders+ forecast isseud to the supplier weekly production plans sent raw mat information 40 (size) 20 (size) 40 (surf) 10 (variant) 90% 95 100 85 3 2 2 90 3 3 50% dedicated TOTAL TIMELINE 7.5 6.25 10 5 11.25 8.75 48.75 TROUGHPUT-TIME48.75 day 90 120 100 150 140 600 VA TIME 600 sec EPE computation EPE>= Ts/(Ta-Tp) sizes 4 surface 12 Cutting 0.167033 variant 48 Finishing 4.114286 Value StreamMapping IconsINFORMATIONFLOW ICONSMATERIALFLOW ICONS Inventory BoxPUSH ArrowFinished Goods to CustomerSupermarketPhysicalPull Manual Info FlowElectronicInfo FlowWeekly ScheduleScheduleKanbanHeijunka BoxPre-Shop-PullKaizen First-In-First-OutSequence FlowOperatorTruck ShipmentDaily shipmentsF I F O3300 units1200 units INFORMATIONFLOW ICONS Direct shipping XYZ Corp.Outside SourcesData BoxSupplierProductionplanningCustomerD= 400 pieces/dayDmix=MachiningC/T= 90C/O= 0 A= ShiftsCuttingC/T= 120/2 C/O= A= ShiftsFinishingC/T= 100 C/O= A= ShiftsChemical PaintingC/T= 150 C/O= A= ShiftsPackagingC/T= 140/2C/O= A= Shifts PressC/T= C/O= A= Shifts3000 units3300 units3300 units3300 units3300 unitsEvery 2 weeks shipments FOR THE TIMELINE PLEASE USE DIRECTLY THE EXCEL CELLS Stages Formula Value Notes 1 AND 4 AND 5 TA/D 202.5 SEC/PC 2 AND 3 TA/D 135 SEC/PC ChoiceFGW/MTS Drivers CONTINUOUS FLOW 1 Stages to be coupledpackaging + chemical painter (before I dedicate one operator of pack 100% to the product family we are considering) Variables Formula Value Notes N ope WCT/TT 1.432098765 2 operators CT max CT 150 sec CO max CO 40 min A PRODUCT OF AVAILABILITIES 0.765 # shifts 3 3 DECAF CONDITION Dedicated?YES (I dedicate one operator of pack 100% to the product family we are considering) Capable?CT<TT --> 150<202,5…
First page of the document.