Document information
- University
- Politecnico di Milano
- Degree programme
- Management Engineering
- Subject
- Operations Management
- Classification
- Exam · Full exam
- Content
- Exam paper only
- Original format
- Text
- Searchable text
Full exam for Operations Management in the Management Engineering degree programme at Politecnico di Milano. The document covers: 4.In the cutting stage is a cell where currently there are 4 operators employed to perform four different manual tasks which take respectively 7 min, 4min, 6min and 4min. The cutting stage is based on 3 shifts of 8hours each. The product daily demand is 200 pieces. Determine
Full exam for Operations Management in the Management Engineering degree programme at Politecnico di Milano. The document covers: 4.In the cutting stage is a cell where currently there are 4 operators employed to perform four different manual tasks which take respectively 7 min, 4min, 6min and 4min. The cutting stage is based on 3 shifts of 8hours each. The product daily demand is 200 pieces. Determine
Import quality: text was extracted directly from the original document.
Representative passages recognised in different parts of the material. The full extracted text remains available to search, while this compact preview makes the page easier to read.
4.In the cutting stage is a cell where currently there are 4 operators employed to perform four different manual tasks which take respectively 7 min, 4min, 6min and 4min. The cutting stage is based on 3 shifts of 8hours each. The product daily demand is 200 pieces. Determine whether the number of operators can be reduced in order to save a resource for other value-added activities (1 Point) The cell needs 3 operators to address the overall work-content. The fourth operator can be employed in another stage The cell needs all the 4 operators to address the overall work-content Only 2 operator are necessary to address the overall work-content The cell requires 4 different operators to address each of the four activities 5.Lean and digitalisation (1 Point) Successful companies digitalise their processes and they implement Lean to improve them Companies that deeply embrace digitalisation, do not need lean management Companies that deeply embrace lean management do not need digitalisation Successful companies adopt lean management before digitalising their processes 6.Esselunga, as per health guidelines, adopted an M/M/1 configuration for the waiting line outside the supermarket. How does the average throughput time of that system change when prioritizing over 65-year olds over other customers ? (1 Point) it decreases it increases it depends on peak times it remains unchangedthe 7.Which one of the following statement is false considering the daily production capacity of a coupled system (1 Point) It is affected by the product of the availabilities of all the stages that compose the system It is always lower than the daily production capacity of a decoupled system It is computed considering the maximum change over time It is computed considering the maximum cycle time…
First page of the document.