Back
NotesComplete set

Completed notes of the course Part 2

Study material for Design and Management of Production Systems, shared by the Studwiz community and reviewed by moderators.

Design and Management of Production SystemsComplete set

Document information

What's included in this study material

Study material for Design and Management of Production Systems, shared by the Studwiz community and reviewed by moderators.

Import quality: text was extracted directly from the original document.

Extracted content from the document

Representative passages recognised in different parts of the material. The full extracted text remains available to search, while this compact preview makes the page easier to read.

Page 1

Assembly: Classification: basedon - -> layoutconfiguration -> Fixedposition: · all resources come to aprint where theyare assembled. · Bigor fragileproducts(low volume,highvariability) -> Assemblyshop · Departmentsdevoted tospecificassemblyactivities -> Assemblycell ·Cellsdevotedtoeach/fewproducts.(highdemand prodel -> Assemblyline · Workstationinsequence · Onlyforproductsinhighdemand& lowvariability -> ProductionMin -> singlemodel I · Assemblyofonly1 varietyof product (AAAAA) - minedmodel · Assemblyofmultiplevarietiesin smallbatches(ABCCAABCABB) · Cinventoryd,#setup - so usedforproductswith unitarysetup& · Isetupmuchhigherthan multimodelso Catupoveralla -> MultiModel · Assemblyofmultiplevarietiesin largebatches(AAAABBBCCC) · Usedforproductswithuniterysetup - so largerbatches- setups& · Cinventory -> Ta s kOrganization -> usedto knowhowmanyoperatorsto behired. -> Ta s kparcelization · I person1 (orfewltasks (Assemblyline) -> Ta s krecomposition · I person,fewtasks (Fixedpositionor Assemblycell) -> self-managedteam · team- all activities · workforcecost -> Reciprocalmovement -> Operator - Assembly · Operatormoves toassembly · Fixedposition -> Assembly - Operator · Partmoves to diff.Stations · Assemblyline, cells,shops Data >Assemblytime(averagevalues:Mis -> standarddeviation,8K -> since workforceinvolved >Worksampling ⑧-> standardtimes Islidepage19-26) -> MotiontimeMeasurement(MTM) - mostcommonlyused Mr:2 mi Sx = VEssizitk Learningeffectshouldbe incorporated. LayoutConfiguration: highvariability low volume d ↑ highvolum lowvarietyhighrepetiveness Fixed position: · Forbig,heavyor fragileobjects · For simpleobjectsin mediumproductionvolume · Highquality -> Advantages: 1. Highflexibility - mainlyin terms ofproductionwin 2. Low investment- no conveyers,etc 3. Job…

Preview

First page of the document.

First page: Completed notes of the course Part 2