Full exam for Wind, Hydro and Geothermal Power Generation in the Energy Engineering degree programme at Politecnico di Milano. The document covers: POWER PRODUCTION FROM RENEWABLE ENERGY AY 2020-21 3rd September 2021 Prof. Silva Time: 1.5 hours Instructions for the examination: 1) Clearly indicate your name on all the files you will deliver. 2) The score refers to exercises done in a comprehensive manner with exact
Full exam for Wind, Hydro and Geothermal Power Generation in the Energy Engineering degree programme at Politecnico di Milano. The document covers: POWER PRODUCTION FROM RENEWABLE ENERGY AY 2020-21 3rd September 2021 Prof. Silva Time: 1.5 hours Instructions for the examination: 1) Clearly indicate your name on all the files you will deliver. 2) The score refers to exercises done in a comprehensive manner with exact
Import quality: text was extracted directly from the original document.
Representative passages recognised in different parts of the material. The full extracted text remains available to search, while this compact preview makes the page easier to read.
POWER PRODUCTION FROM RENEWABLE ENERGY AY 2020-21 3rd September 2021 Prof. Silva Time: 1.5 hours Instructions for the examination: 1) Clearly indicate your name on all the files you will deliver. 2) The score refers to exercises done in a comprehensive manner with exact numerical results. Numerical results correct but not accompanied by explanations will not be taken into account. The final score can be normalized according to the average results. 3) Talking with colleagues and / or cheating will cause the cancellation of the exam. 4) All the needed data for the resolution of exercises lies on this paper. It is NOT ALLOWED to use material other than this (e.g. books, clipboard etc.). Exercise 1 (15 points) A geothermal source has the following characteristics at the outlet of the well: temperature 185°C, enthalpy 1100 kJ/kg. CASE A Consider a single flash direct steam cycle cogenerative plant, based on a cooling tower condenser with a condensation pressure of 0.07 bar. The flash pressure is 4.4 bar. Design the lay -out of the plant (i) with all the components ( 1 point), considering that the cogenerative heat exchanger is fed by the separated liquid from the flash chamber, with an outlet temperature of the geothermal fluid equal to 48°C. Neglecting the presence of non-condensable gases, calculate (ii) the mass flow rate of the geothermal fluid that should be extracted from the well to obtain a net electric power output of 11 MW, knowing that the electric power consumption of all the auxiliary components of the steam cycle is 700 kW, and that the isentropic efficiency and the organic-electric efficiency of the turbogenerator are respectively equal to 81% and 93% (4 points). Then determine (iii) the vapor fraction at the outlet of the steam turbine (2 points) and (iv)…