Document information
- University
- Politecnico di Milano
- Degree programme
- Energy Engineering
- Subject
- Program and Project Management
- Classification
- Exercises · Complete set
- Original format
- Text
- Searchable text
Study material for Program and Project Management, shared by the Studwiz community and reviewed by moderators.
Study material for Program and Project Management, shared by the Studwiz community and reviewed by moderators.
Import quality: text was extracted directly from the original document.
Representative passages recognised in different parts of the material. The full extracted text remains available to search, while this compact preview makes the page easier to read.
ES3 OUTFLOW INFLOW ① 4K 7K 0 4K 2K 3K 8K 1k ② 2K 3K 1K 0 4K SK 1K 10K ① NPV NPV-2 = 3,90117 + 1 2 3 4 5 6 7 75K 5K 4K 3K 3K 2K 7K NOV-3 -071.77 14 4 NAV -4 - -9781.1142 NPV-5 -18591-11 + 3-3 4. 7141-75: 3,9K 0-5=-97's: " =3 -78591K NPV = 4,725 21045K 117 = 2- 776 NPV-6 -2,045.11 + 8- 2 3175K 4,125K3175.11 + 7 -7 - 1 = NPV-7 :*::::: - 3,923k - 3,375K ⅔}?} + + 45 -7646K 2 - 2,810K ¼:&?:O soon. E. V NOV-3 - 907.71 + NAV -4 3 NOV-5 3 NPV-6 NPV-7 2 ¾:::: 7 NPV = 5-909 - 7,77 3,032 BCWSEEEEE.NO = BEY = apr 31 BCWP IT ACWP BCWP E.EE" senses" ¾ BAC EAC = ACWP + ETC = ACUP+ BAC-BCWP ETC EAC VAC = BAC-EAC ES 2 CP/com = BCWPcom = 5900 = 0,905AC Way 6520 SP/com = BCWP.com = 5900 BCW SCUM 6500 = 0,907 EAC = ACWA + ETC = BAC-BCWP CP/3m 790+730+670CP/3m = BC WP3M ACWPsm= 770+760 +750 - - 01967 ETC = EAC-ACWA= 77879- 6520=5359 77050 - 5900 01967 + ACHA = + 6520=71879 VAC = BAC- EAC: 17050-77879=-829 (Plos = BAC - BCWPcum SP/03 = BAC - BCWP.com - 17050 - 5900 - 1,731 BAC - ACUPCUM BAC- BCWScum - 77050 - 11050 - 6520 11050 - 6500 5900 - 1/736 SCI = CP1. SPI CP/03 = BAC - BCWP SP/03 = BAC - BAC - BAC - BOWS BCWP -ACWP ACWP BCWP CV = TV = BCWP - BOWS CPI FORMULAS TCP/ = BAC-BCWA GAC-ACWP ES 4 R1 P = 0165 3 DAYS STOP COST = 34. 600 401 - 35 €1 = 63K€ R2 β = Org COST = 80K€ R3 D= 0,7 COST = 260k€ AMOUNT 70 COVER 80 % R1 63K€ 0,65. /7- 0/9/17-0.71100 = 5,8590 R2 80K€ 17-0,65) -org (1-0,7) - 100 = 28,3590 R3 260K€ (1-0,65)/1-0,9) -0,7- 700 = 0/35 % R1-R2 743K€ 0,65. Org. (7-0,7)-700 = 52,65 % 0165./7-0,9) -0,7 - 700 = 0,65% 17-0,65) -org -0,1 -100 = 3,15%0 0165 - 0,9. 011 • 700=5,85%0 R1-R3 R2-R3 Ri-Ra-R, 403K€ FORMULE COST ESTIMATION C- COST NEW P. 323K€ 340k€ NR ONE (7-0165)/1-0,9) (1-0/1)-700=3,15/0 3,15% 9% 37,3590 371790 90135 % 91%0 9417590 100%0 Co-6057 OLD P. P -SIZE NEW P. C =…