Back
Other

Lab Disassembly planning

University study material for De-manufacturing in the Management Engineering degree programme at Politecnico di Milano. The document covers: Labs: Disassembly Planning Dipartimento di Meccanica Sezione Tecnologie Meccaniche e Produzione Demanufacturing (5 credits) <Labs: Disassembly strategies> Exercise 1: laptop case Figure 1 Figure 2 The laptop in the figure has to be disassembled to recover the maximum value from

De-manufacturingOther

Document information

What's included in this study material

University study material for De-manufacturing in the Management Engineering degree programme at Politecnico di Milano. The document covers: Labs: Disassembly Planning Dipartimento di Meccanica Sezione Tecnologie Meccaniche e Produzione Demanufacturing (5 credits) <Labs: Disassembly strategies> Exercise 1: laptop case Figure 1 Figure 2 The laptop in the figure has to be disassembled to recover the maximum value from

Import quality: text was extracted directly from the original document.

Extracted content from the document

Representative passages recognised in different parts of the material. The full extracted text remains available to search, while this compact preview makes the page easier to read.

Page 1

Labs: Disassembly Planning Dipartimento di Meccanica Sezione Tecnologie Meccaniche e Produzione Demanufacturing (5 credits) <Labs: Disassembly strategies> Exercise 1: laptop case Figure 1 Figure 2 The laptop in the figure has to be disassembled to recover the maximum value from the end of life product. The following data are known: 1. Exploded view of the laptop; 2. Bill of Materials (BOM); 3. Precedence graph; 4. End of life value for each laptop component; 5. The task times. <Labs: Disassembly strategies> Exercise 1: laptop case The laptop in the figure has to be disassembled to recover the maximum value from the end of life product. The following data are known: 1. Exploded view of the laptop; 2. Bill of Materials (BOM); 3. Precedence graph; 4. End of life value for each laptop component; 5. The task times. Figure 3 <Labs: Disassembly strategies> Exercise 1: laptop case The task times are reported in the following table. Table 4 and 5 ID Component EOL Value (Euro) Task time (tu) A Display assembly 16 4 B Hinge cover 1 3 C Keybord 0 3 D Palm rest 0 5 E System board 12 5 F Optical drive 7 3 G Main battery 8 2 H Computer base 2,5 2 I Hard drives 11 6 J Speakers 0 5 K Microprocessor thermal - cooling assembly 0 3 L Microprecessor 0 1 M Fan 1,5 2 <Labs: Disassembly strategies> Exercise 1: laptop case A. Formulate the problem of finding the best disassembly level to maximize the profit, without considering set up times, knowing that the fixed cost of disassembly is 1 Euro/tu. Solve the problem and suggest a feasible and optimal sequence. B. Formulate the problem of finding the best disassembly sequence, considering in input a given disassembly level and taking into consideration the set-up times reported below. C. Solve the joint problem. D. Compare the two solutions. STT…

Preview

First page of the document.

First page: Lab Disassembly planning