Document information
- University
- Politecnico di Milano
- Degree programme
- Energy Engineering
- Subject
- Solar and Biomass Power Generation
- Classification
- Exam · Full exam
- Content
- Exam paper only
- Original format
- Text
- Searchable text
Full exam for Solar and Biomass Power Generation in the Energy Engineering degree programme at Politecnico di Milano. The document covers: SOLAR AND BIOMASS POWER GENERATION AY 2021-22 11th January 2022 Prof. Giampaolo Manzolini Time: 100 minutes Instructions for the examination: 1) Clearly indicate your surname and name on all the sheets you will deliver. 2) The score refers to exercises done in a comprehensive
Full exam for Solar and Biomass Power Generation in the Energy Engineering degree programme at Politecnico di Milano. The document covers: SOLAR AND BIOMASS POWER GENERATION AY 2021-22 11th January 2022 Prof. Giampaolo Manzolini Time: 100 minutes Instructions for the examination: 1) Clearly indicate your surname and name on all the sheets you will deliver. 2) The score refers to exercises done in a comprehensive
Import quality: text was extracted directly from the original document.
Representative passages recognised in different parts of the material. The full extracted text remains available to search, while this compact preview makes the page easier to read.
SOLAR AND BIOMASS POWER GENERATION AY 2021-22 11th January 2022 Prof. Giampaolo Manzolini Time: 100 minutes Instructions for the examination: 1) Clearly indicate your surname and name on all the sheets you will deliver. 2) The score refers to exercises done in a comprehensive manner with exact numerical results. Numerical results correct but not accompanied by expla- nations will not be taken into account. The final score can be normalized according to the average results. 3) Answer briefly and clearly only to the asked questions. Calculations and explanations which do not respond to the questions will not be considered for evaluation even if correct. 4) Talking with colleagues and / or cheating will cause the cancellation of the exam. 5) All the needed data for the resolution of exercises lies on this paper. It is NOT ALLOWED to use material other than this (e.g. books, clipboard etc.). 6) Not all the provided inputs are necessary for the problem solving CSP exercise (16 points) Question A (5 points): A CSP plant based on solar tower technology produces 400 GWh of electricity in a year. The solar plant counts 10’000 heliostats by 90 m 2 each and the DNI and diffuse radiations are equal to 2750 kWh/m 2/y and 350 kWh/m2/y, respectively. Calculate the average efficiency of the different conversion steps (optical, thermal, piping, power block and auxiliaries) knowing that the yearly optical efficiency is equal to 65%, the power block operates always at full load between 550°C and 300°C the second law efficiency is equal to 57%, piping losses can be neglected while the auxiliaries consumptions are 1 MW every hour of the year, regardless the plant is operating or not. For simplicity assume a constant ambient temperature of 30°C. Question B (6 points): Calculate the optical…
First page of the document.