1 Economic analysis of different power plants Text

University study material for Energy Conversion A in the Energy Engineering degree programme at Politecnico di Milano. The document covers: ENERGY CONVERSION A 2015-16 1 Project no. 1 Economics of power plants The main purpose of the present analysis is to perform an economic comparison of the follow- ing power generation technologies:  Hydroelectric Hydroelectric pumped storage power plant  PWR Nuclear power

Energy Conversion AOther

Document information

What's included in this study material

University study material for Energy Conversion A in the Energy Engineering degree programme at Politecnico di Milano. The document covers: ENERGY CONVERSION A 2015-16 1 Project no. 1 Economics of power plants The main purpose of the present analysis is to perform an economic comparison of the follow- ing power generation technologies:  Hydroelectric Hydroelectric pumped storage power plant  PWR Nuclear power

Import quality: text was extracted directly from the original document.

Extracted content from the document

Representative passages recognised in different parts of the material. The full extracted text remains available to search, while this compact preview makes the page easier to read.

Page 1

ENERGY CONVERSION A 2015-16 1 Project no. 1 Economics of power plants The main purpose of the present analysis is to perform an economic comparison of the follow- ing power generation technologies:  Hydroelectric Hydroelectric pumped storage power plant  PWR Nuclear power plant with Pressurized Water Reactor  NGCC Natural Gas-fired Combined Cycle  HDGT Natural gas-fired Heavy-Duty Gas Turbine in simple cycle  ADGT Natural gas-fired Aero-Derivative Gas Turbine in simple cycle  NGSC Natural Gas-fired Steam Cycle  CCcog Combined Cycle  PCSC Pulverized Coal Steam Cycle + FGD (Flue Gas Desulphurization)  IGCC Integrated Gasification Combined Cycle  USC Pulverised Coal Ultra-Super Critical Steam Cycle + FGD  CSP Concentrated Solar Power Plant (Parabolic Trough with Diathermic oil + Steam Cycle)  Wind On-shore wind farm Input data are as follows. Power plants characteristics Power Plant I.C. CCF Availability O&M Costs enom (€/kWnom) h/y Fixed Variable (€/kWnom y) (€/MWhe) Hydroelectric 700 0.0905 3000 11 1 0.71 PWR 4000 0.0989 7600 53 1.5 0.35 NGCC 600 0.1053 8000 12.3 1.2 0.58 HDGT 250 0.1009 8000 6 9 0.35 ADGT 300 0.1009 8000 8 9 0.40 NGSC 800 0.1076 7500 13 2 0.41 CC cogen 700 0.1175 5500 16 1.5 0.43 PCSC+FGD 1300 0.1124 7500 17.5 2.5 0.39 IGCC 2000 0.1149 6000 20 3.2 0.43 USC+FGD 1500 0.1124 7250 17.5 3 0.44 CSP See text 0.0977 2100x 11 3 0.25* Onshore Wind§ See text 0.1053 2000y 8 0.2 0.42* * Efficiency with respect to nominal conditions (Direct irradiation of 0.8 kW/m2 and nominal wind speed 8 and 15 m/s). § consider two wind farms with different wind speeds, 8 m/s e 15 m/s respectively. x,y the equivalent hours of the renewable energy sources are calculated considering the output power at nominal conditions.  The typical investment costs (IC) have been…

Preview

First page of the document.

First page: 1 Economic analysis of different power plants Text