Document information
- University
- Politecnico di Milano
- Degree programme
- Management Engineering
- Subject
- De-manufacturing
- Classification
- Exam · Full exam
- Content
- Exam paper only
- Original format
- Text
- Searchable text
Full exam for De-manufacturing in the Management Engineering degree programme at Politecnico di Milano. The document covers: <Labs: Disassembly strategies> Assembled product Exploded view The CubeSat prototype layout is represented in Figure. The following data are known: - Scheme of the portable solar powered vaccine refrigerator. - Bill of Materials (BOM), including information about task time, End
Full exam for De-manufacturing in the Management Engineering degree programme at Politecnico di Milano. The document covers: <Labs: Disassembly strategies> Assembled product Exploded view The CubeSat prototype layout is represented in Figure. The following data are known: - Scheme of the portable solar powered vaccine refrigerator. - Bill of Materials (BOM), including information about task time, End
Import quality: text was extracted directly from the original document.
Representative passages recognised in different parts of the material. The full extracted text remains available to search, while this compact preview makes the page easier to read.
<Labs: Disassembly strategies> Assembled product Exploded view The CubeSat prototype layout is represented in Figure. The following data are known: - Scheme of the portable solar powered vaccine refrigerator. - Bill of Materials (BOM), including information about task time, End of life value and recycling cost for each component. Exercise 4: CubeSat <Labs: Disassembly strategies> Parts list Task time (tu) EOL value (euro/comp) Recycling treat. Cost (euro/comp) 1 Solar panel n1 5 75 2,3 2 Solar panel n2 5 75 2,3 3 Solar panel n3 5 75 2,3 4 Solar panel n4 5 75 2,3 5 Solar panel n5 5 75 2,3 6 Solar panel n6 5 75 2,3 7 Frame n1 4,5 2,7 1,2 8 Frame n2 4,5 2,7 1,2 9 Sun sensor 4,5 140 3,7 10 Super capacitor 2,5 35 5,5 11 Coin battery 3 55 12 12 Magnetometer 2,5 65 7,5 13 Electronic Circuit 7,5 20 3,5 14 Primary battery 2 125 22 15 Gyro Sensor 3,5 50 9 16 Receiver 3,5 100 6,5 17 Transmitter 3,5 120 6,5 18 Transmitting Antenna 4 70 4,5 19 Receiving Antenna 4 70 4,5 20 Secondary Battery 2 90 18 21 Support 1,5 8 1,1 Bill of materials Exercise 3: CubeSat <Labs: Disassembly strategies> ITEM A. Define a feasible disassembly precedence graph (component-oriented) by analysing the exploded view. Additional information: Gyro Sensor, Receiver and Primary Battery are mounted on the Transmitter component; they should be screwed in direction –y. 9 2 1 5 6 11 21 15 16 7 +y -y -x +y +y +y -y -y 4,5 5 5 5 3,5 3,5 3 1,5 H H H 21 75,5 tu 14 ±x, ±y, ±z 10 +y 2,5 12 +y 2,5 20 +y 14 2 3 5 H 19 4 18 4 4 5 H 17 H H -y -y 3,5 5 8 13 H -z +z +x +x +x +z 4,5 -z 4,5 H H H H H H 2 Exercise 3: CubeSat <Labs: Disassembly strategies> ITEM B. Based on the product structure diagram, formulate the problem of finding the best disassembly sequence to maximize the profit, taking into consideration all the given…
First page of the document.