← Back
ExamFull examExam paper only

17 07 17sol2

Study material for Economia e Organizzazione Aziendale C, shared by the Studwiz community and reviewed by moderators.

Economia e Organizzazione Aziendale CFull exam

Document information

What's included in this study material

Study material for Economia e Organizzazione Aziendale C, shared by the Studwiz community and reviewed by moderators.

Import quality: text was extracted directly from the original document.

Extracted content from the document

Representative passages recognised in different parts of the material. The full extracted text remains available to search, while this compact preview makes the page easier to read.

Page 1

ECONOMIA E ORGANIZZAZIONE AZIENDALE C - Appello 17.07.2017 Allievi biomedici e chimici Esercizio 1 (Punti 14) - GAZZOSA SOLUZIONE MD necessarie kg €/kg MD Prep MD Conf (1 €/conf) Costo MD tot / lotto A1 - 600 600 C1 - 350 350 B1 500 1,5 750 580 1.330 A2 550 2 1100 1.100 Costo LD A1 C1 B1 A1 Preparazione 1.000 2.400 Sagomatura 3.000 3.200 3.000 Stampaggio 1.000 1.600 Confezionamento 1.600 1.200 9.00 Costo LD tot / lotto 4.600 2.200 6.700 5.400 OVH (€) base Mensile Preparazione Sagomatura Stampaggio Confezionamento Ammortamento 1.666,67 2.083,33 ½ Grafico 1.250 Operaio Specializzato 2.000 Materiali Indiretti 1.000 1.500 Energia 3.000 3.000 2.000 2.000 TOT OVH REPARTO 5.666,67 5.083,33 4.750,00 4.000 Tipo BA BA TOT OVH tot (€) K (€/min) Preparazione B1 + A2 Costo MD 1.850 5.667 3,06 Sagomatura A1 + B1 + A2 Costo LD 9.200 5.083 0,55 Stampaggio C1 + B1 Ore LD 130 4.750 36,54 Confezionamento A1 + C1 + B1 Ore LD 185 4.000 21,62 350 580 OVH A1 (€) OVH C1 (€) OVH A2(€) OVH B1 (€) Preparazione 3.369,37 2.297,3 Sagomatura 1.657,61 1.657,61 1.768,12 Stampaggio 1.826,92 2.923,08 Confezionamento 1729,73 1.297,3 972,97 OVH tot / lotto 3.387 3.124 5.027 7.961 A1 (€) MD LD OVH WIP 5.000 Reparti 600,0 4.600 3.387 CPI unitario (€) 13.587,34 22,65 C1 (€) MD LD OVH WIP 5.500 Reparti 350 2.200 3.124 CPI unitario (€) 11.174,22 31,926 B1 (€) MD LD OVH Reparti 1.330 6.700 7.961 CPI unitario (€) 15.991,46 27,57 A2 (€) MD LD OVH Reparti 1.100 5.400 5.027 WIP FIN = 11.526,98 Sc fin MP old = (600 kg – 500) * 1,5 €/kg = 150 € Sc fin MP new = (1500 kg – 550) * 2 €/kg = 1900 € LOGICA FIFO! Vendita Scorte CPI Scorta Vendita Nuovo CPI Nuovo Costo Del Venduto € A 200 23,5 600 22,65 18287,34 B 70 32,85 430 27,57 14155,24 C 60 33,33 240 31,93 9662,323 CdV TOT 42.104,9 € SC finali unità Valore € Scorta A 0…

Preview

First page of the document.

First page: 17 07 17sol2