← Back
ExamFull examExam paper only

18 01 18s

Study material for De-manufacturing, shared by the Studwiz community and reviewed by moderators.

De-manufacturingFull exam

Document information

What's included in this study material

Study material for De-manufacturing, shared by the Studwiz community and reviewed by moderators.

Import quality: text was extracted directly from the original document.

Extracted content from the document

Representative passages recognised in different parts of the material. The full extracted text remains available to search, while this compact preview makes the page easier to read.

Page 1

<Exam Simulation> Exam Simulation: Exercise 1 – ITEM A Exploded view Parts list Task time (tu) EoL Value (euro/comp) Recycling (euro/comp) 1 Cover 3,5 1 0,1 2 PCB 5,5 5,5 1,5 3 Frame/Bracket 0,7 0,3 0,02 4 Printed circuit cable 0,5 0,5 0,1 5 Plate 1,5 0,7 0,3 6 Spindle 2 0,9 0,15 7 Actuator (permanent magnets) 2,5 4,5 2,5 8 Base casting 3,5 0,5 0,1 9 E-block (n°3) 0,7 0,15 0,02 10 Disks (n°3) 0,3 0,4 0,12 <Exam Simulation> Exam Simulation: Exercise 1 - ITEM A 5 9A +y +y 0,7 14 19,2 tu-x, ±y 1 +y 3,5 2 1,5 10A +y 0,3 9B +y 0,7 10B +y 0,3 9C +y 0,7 10C +y 0,3 7 2,5 6 2 +y +y 3 4 -y -x 0,5 2 -y 5,5 0,7 8 H H <Exam Simulation> Strategy to solve step 1: Smart search. Analyze each branch of the precedence graph separately. Exam Simulation: Exercise 1- ITEM B <Exam Simulation> ID Component Hazardous comp. EOL value (euro/comp) Task time (tu) Disassembly cost (euro) Rec.Treat. cost (euro) Delta 1 Cover 1 3,5 1,4 0,1 -0,4 2 PCB H 5,5 5,5 2,2 1,5 3,3 3 Frame/Bracket 0,3 0,7 0,28 0,02 0,02 4 Printed circuit cable 0,5 0,5 0,2 0,1 0,3 5 Plate 0,7 1,5 0,6 0,3 0,1 6 Spindle 0,9 2 0,8 0,15 0,1 7 Actuator (permanent magnets) H 4,5 2,5 1 2,5 3,5 8 Base casting 0,8 3,5 1,4 0,1 0,8 9 E-block n1 0,15 0,7 0,28 0,02 -0,13 10 E-block n2 0,15 0,7 0,28 0,02 -0,13 11 E-block n3 0,15 0,7 0,28 0,02 -0,13 12 Disks n1 0,4 0,3 0,12 0,12 0,28 13 Disks n2 0,4 0,3 0,12 0,12 0,28 14 Disks n3 0,4 0,3 0,12 0,12 0,28 Total 15,85 19,2 7,68 11,595 8,17 Data: - 1 tu is 30 seconds long; disassembly cost: 0,4 €/tu Exam Simulation: Exercise 1- ITEM B <Exam Simulation> Exam Simulation: Exercise 1- ITEM B 5 9A +y +y 0,7 14 19,2 tu-x, ±y 1 +y 3,5 2 1,5 10A +y 0,3 9B +y 0,7 10B +y 0,3 9C +y 0,7 10C +y 0,3 7 2,5 6 2 +y +y 3 4 -y -x 0,5 2 -y 5,5 0,7 8 H H <Exam Simulation> • R2-3-4=3,62 € If 1 and 9 (A, B, C) are…

Preview

First page of the document.

First page: 18 01 18s