Document information
- University
- Politecnico di Milano
- Degree programme
- Management Engineering
- Subject
- Industrial Technologies
- Classification
- Exercises · By topic
- Original format
- Text
- Searchable text
Topic-based study materials for Industrial Technologies in the Management Engineering degree programme at Politecnico di Milano. The document covers: Lunch boxes assembly line After graduating in Engineering, Kevin Kudo decided to dedicate 6 months to his childhood passion: boy-scouts. He joined the local boy -scout chapter and decided to help them improve their day -by- day operations by applying concepts and methodologies
Topic-based study materials for Industrial Technologies in the Management Engineering degree programme at Politecnico di Milano. The document covers: Lunch boxes assembly line After graduating in Engineering, Kevin Kudo decided to dedicate 6 months to his childhood passion: boy-scouts. He joined the local boy -scout chapter and decided to help them improve their day -by- day operations by applying concepts and methodologies
Import quality: text was extracted directly from the original document.
Representative passages recognised in different parts of the material. The full extracted text remains available to search, while this compact preview makes the page easier to read.
Lunch boxes assembly line After graduating in Engineering, Kevin Kudo decided to dedicate 6 months to his childhood passion: boy-scouts. He joined the local boy -scout chapter and decided to help them improve their day -by- day operations by applying concepts and methodologies learned at the university. The first area of improvement was, without any doubt, assembling lunch boxes. He remembers having studied techniques to design an assembly line, a much better configuration in comparison to the current, very inefficient, “fixed position” configuration. With 500 meal boxes to package per day, during the big summer gathering, and just a 5 hours working shift (operators start working at 6am but all boxes have to be ready by 11am), a paced-line would avoid t he very frequent delays and meal -box shortages that were dogging the former organization. The assembly process of a lunch box has been decomposed into the following elementary tasks: Task Precedence Task Duration Mean [seconds] Standard Deviation [seconds] A - 15 5 B A 15 2 C A 15 6 D A 5 2 E B, C 10 2 F C 10 5 G C, D 12 2 H D 8 2 I E, F 8 2 L G, H 7 4 M L 12 2 N I, M 18 5 Assignments 1. Start drawing the assembly graph of a lunch box. 2. Calculate the cycle time. 3. Design a manual assembly line adopting the Maximum Incompletion Probability Allowed criteria (with max probability = 10%), adequately commenting all steps followed and showing all calculations. When more than one operation is available, priority should always be given to the operation with the maximum number of direct and indirect succeeding operations. 4. Critical comments. Which secondary prioritization criteria did you adopt (in line with the primary criteria of max n. of successors) and why? 5. Please comment on the final solution and add any relevant…
First page of the document.