Document information
- University
- Politecnico di Milano
- Degree programme
- Mobility Engineering
- Subject
- Finance and Management of Infrastructure Investments
- Classification
- Exam · Full exam
- Content
- Solution only
- Original format
- Text
- Searchable text
Study material for Finance and Management of Infrastructure Investments, shared by the Studwiz community and reviewed by moderators.
Study material for Finance and Management of Infrastructure Investments, shared by the Studwiz community and reviewed by moderators.
Import quality: text was extracted directly from the original document.
Representative passages recognised in different parts of the material. The full extracted text remains available to search, while this compact preview makes the page easier to read.
Titolo presentazione sottotitolo • Milano, XX mese 20XX Exam FMII – 19th January 2023 Section I – Q1 4 73 C 8 114 0 22 B 2 42 4 117 D 4 110 2 31 E 9 107 2 86 F 4 102 The critical path is A-D-H-J. The project duration is 19 weeks. 0 44 A 0 40 2 42 G 8 106 8 124 I 10 142 11 143 H 11 140 Section I – Q1 (Solution) 14 195 J 14 190 ➢ Path A-D-H-J: P(Duration > 24 ) = P(z > 24−19 4+1+4+4) = 𝑃 𝑧 > 1.39 = 1 − 𝑃(𝑧 < 1.39) = 1- 0.9177 = 8.23% ➢ Path B-F-I-J: P(Duration < 15 ) = P(z < 15−17 1+9+4+4) = 𝑃 𝑧 < −0.47 = 1 − 𝑃 𝑧 < 0.47 = 1 −0.6808 = 31.92% ➢ ACWP = 40 000+15 000+20 000+70 000+5 000+48 000+12 000+2 000 = 212 000€ ➢ BCWS = 35 000 + 10 000 +24 000 + 63 000*3/7 + 4 000 + 54 000*5/6 + 10 000 = 155 000€ (Consider that at T=7, activities D has been performed only for 3/7 and activity F for 5/6). ➢ BCWP = 35 000 + 10 000 +24 000*0.2 + 63 000 + 4 000 + 54 000*0.8 + 10 000 +25 000*0 = 170 000 € Section I – Q1 (Solution) Section I – Q2
First page of the document.