← Back
ExamFull examExam paper onlyItalian

Giugno 2021

Study material for Impianti Industriali e Organizzazione D'impresa, shared by the Studwiz community and reviewed by moderators.

Impianti Industriali e Organizzazione D'impresaFull exam

Document information

What's included in this study material

Study material for Impianti Industriali e Organizzazione D'impresa, shared by the Studwiz community and reviewed by moderators.

Import quality: text was extracted directly from the original document.

Extracted content from the document

Representative passages recognised in different parts of the material. The full extracted text remains available to search, while this compact preview makes the page easier to read.

Page 1

Suggerimento di svolgimento Email di paolo trucco l’installazione di un buffer tra le fasi S1 e S2 di processo consentirebbe di sincronizzare diversamente i profili di domanda di servizio delle due fasi. In particolare, portando avanti di 6 ore la domanda di servizio di S2, si avrebbe un picco complessivo di 200 uds/ora invece che l’attuale 250. Nell’ipotesi di configurazione centralizzata, questo si traduce nella realizzazione di un generatore più piccolo. La dimensione del buffer deve coprire 6 ore di produzione, ovvero 600 pezzi. Il punto c) si risolve andando a uguagliare il risparmio di investimento (minor costo generatore + costo buffer) con il costo operativo annuale (incognito) del buffer attualizzato per la vita utile residua (il PVa era un dato) Per quanto riguarda la disponibilità della configurazione frazionata, la sua ipotesi è corretta: i due generatori sono da considerarsi in serie xchè non è possibile una fornitura parziale. Saluti pt

Preview

First page of the document.

First page: Giugno 2021