← Back
ExamFull examSolution only

1692799753 Exam Solution February 2023

Study material for Finance and Management of Infrastructure Investments, shared by the Studwiz community and reviewed by moderators.

Finance and Management of Infrastructure InvestmentsFull exam

Document information

What's included in this study material

Study material for Finance and Management of Infrastructure Investments, shared by the Studwiz community and reviewed by moderators.

Import quality: text was extracted directly from the original document.

Extracted content from the document

Representative passages recognised in different parts of the material. The full extracted text remains available to search, while this compact preview makes the page easier to read.

Page 1

Section I – Q1 5 94 B 8 123 18 213 H 18 2105 127 C 5 120 21 265 I 21 260 12 142 F 19 217 The critical path is A-C-E-H-I. The project duration is 26 weeks. 0 55 A 0 50 12 131 G 20 218 12 186 E 12 180 9 178 D 13 214 Section I – Q1 (Solution) Section I – Q1 (Solution) Activity Immediate Predecessor Duration (weeks) Duration Reduction Total Crashing Cost (€) Unitary Crashing Cost (€) A - 5 3 36 000€ 12 000€ B A 4 1 9 000€ 9 000€ C A 7 6 36 000€ 6 000€ D B 8 2 3 000€ 1 500€ E B, C 6 4 32 000€ 8 000€ F C 2 1 1 000€ 1 000€ G C 1 - - - H E 3 2 14 000€ 7 000€ I D, F, G, H 5 2 18 000€ 9 000€ ➢ Among activities of the critical path A-C-E-H-I, the lowest unitary crashing cost and highest potential benefit is associated with the crashing of activity C. However, crashing C, would lead to an overall project duration reduction of 3 weeks, due to the emergence of another critical path (A-B-E-H-I). As a consequence, crashing C is not convenient since the real economic saving (3*10 000 = 30 000€) is lower than the total crashing cost (36 000€). ➢ Consequently, the most convenient activity to crash is activity E, that leads to a real project duration reduction of 4 weeks. ➢ In this case the margin achieved is: 4*10 000 – 32 000 = 8 000€. 5 94 B 5 90 14 173 H 14 1705 127 C 5 120 17 225 I 17 220 12 142 F 15 173 After crashing E, the critical paths are: ➢ A-B-D-I ➢ A-C-E-H-I 0 55 A 0 50 12 131 G 16 174 12 142 E 12 140 9 178 D 9 170 Section I – Q1 (Solution) Section I – Q1 (Solution) Activity Immediate Predecessor Duration (weeks) Duration Reduction Total Crashing Cost (€) Unitary Crashing Cost (€) A - 5 3 36 000€ 12 000€ B A 4 1 9 000€ 9 000€ C A 7 6 36 000€ 6 000€ D B 8 2 3 000€ 1 500€ E B, C 6 4 32 000€ 8 000€ F C 2 1 1 000€ 1 000€ G C 1 - - - H E 3 2 14 000€ 7 000€ I D, F, G, H 5 2 18…

Preview

First page of the document.

First page: 1692799753 Exam Solution February 2023