Document information
- University
- Politecnico di Milano
- Degree programme
- Mobility Engineering
- Subject
- Finance and Management of Infrastructure Investments
- Classification
- Exam · Full exam
- Content
- Solution only
- Original format
- Text
- Searchable text
Full exam for Finance and Management of Infrastructure Investments in the Mobility Engineering degree programme at Politecnico di Milano. The document covers: Exercise 1 • A) The following project is assigned. Identify the critical path. Can be the project concluded before week 15? • Considering the possibility to crash the activities as shown in table 2 identify the optimal solution according to a crashing programme. A penalty of 10
Full exam for Finance and Management of Infrastructure Investments in the Mobility Engineering degree programme at Politecnico di Milano. The document covers: Exercise 1 • A) The following project is assigned. Identify the critical path. Can be the project concluded before week 15? • Considering the possibility to crash the activities as shown in table 2 identify the optimal solution according to a crashing programme. A penalty of 10
Import quality: text was extracted directly from the original document.
Representative passages recognised in different parts of the material. The full extracted text remains available to search, while this compact preview makes the page easier to read.
Exercise 1 • A) The following project is assigned. Identify the critical path. Can be the project concluded before week 15? • Considering the possibility to crash the activities as shown in table 2 identify the optimal solution according to a crashing programme. A penalty of 10 000€ is applied in case the project is not concluded before week 13. Activity Immediate Predecessor Duration (Weeks) Duration Reduction (Crashing) Total Crashing Cost (€) A - 4 1 15 000€ B - 7 3 30 000€ C A 2 1 8 000€ D A,B 1 / / E C 5 2 16 000€ F B,D,E 4 1 9 000€ G E,F 2 2 30 000€ Exercise 1 • Considering the possibility to crash the activities as shown in table 2 identify the optimal solution according to a crashing programme. A penalty of 10 000€ is applied in case the project is not concluded before week 13. • Considering the following budget information compute the project performances. Consider that Time Now = 10 and that BCWS = current BCWP at month 8 (no crashing is considered). • Which are the Estimate at completion (EAC) in terms of time and money in case of contingent error? And in case of Structural error? Activity Expected Costs (€) Real Costs (€) BCWP criteria (milestones) Percentage of Completion A 18 000€ 20 000€ 20-80 All Milestones completed B 35 000€ 40 000€ 0-100 All Milestones completed C 40 000€ 30 000€ 0-50-100 Second Milestone Completed (50%) D 35 000€ 15 000€ 20-80 First Milestone completed E 20 000€ 5 000€ 20-80 First Milestone completed F 30 000€ - 0-100 G 20 000€ - 20-80 Critical path: A,C,E,F,G A,C,E,G Non Riesce a finire entro la settima 15! CRASHING PENALITY= 10 k€/WEEKS se non si finisce entro la settimana 13 CRASHING E!!! 0 4 4 A 0 0 4 4 2 6 C 4 0 6 6 5 11 E 6 0 11 15 2 17 G 15 0 17 11 4 15 F 11 0 15 0 7 7 B 3 3 10 7 1 8 D 10 3 11 Activity Predecessor Duration…
First page of the document.